River West Multi-Family - Project I

440 N Halsted St, Chicago, IL 60642  United States

Dining Room

Living Room

Kitchen

Entry Corridor

Bathrooms

Bedrooms

Closets

 3D Mapping

See Full Rendering Here

and Here

Cosmetic Alterations

Paint

Paint - Zoe

 Proposed Scope:

 

​

   Prep Work

 

(Main bedroom, main bedroom closet 1, main bedroom closet 2, main bedroom bath, living room, kitchen, dining, bedroom 2, bedroom 2 closet, bedroom 2 bath, bedroom 3, bedroom 3 closet, bedroom 3 bath, U-corridor, laundry room, pantry, powder room, mechanical room*, low voltage closet, common coat closet 1, common coat closet 2)

​

   - Floor protection.

   - Plastic tarp.

​

​

   Prime 

​

(Main bedroom, main bedroom closet 1, main bedroom closet 2, main bedroom bath, living room, kitchen, dining, bedroom 2, bedroom 2 closet, bedroom 2 bath, bedroom 3, bedroom 3 closet, bedroom 3 bath, U-corridor, laundry room, pantry, powder room, mechanical room*, low voltage closet, common coat closet 1, common coat closet 2)

​

   - Doors

   - Trim

   - Interior walls

   - Exterior walls

   - Ceiling

   - Wooden cabinets

   - Kitchen water damage patch (moldicide oil-based)

   - Low voltage closet patch (moldicide oil-based)

   - Rear egress patch (moldicide oil-based)

​

​

    Top Coat Paint 

 

(Main bedroom, main bedroom closet 1, main bedroom closet 2, main bedroom bath, living room, kitchen, dining, bedroom 2, bedroom 2 closet, bedroom 2 bath, bedroom 3, bedroom 3 closet, bedroom 3 bath, U-corridor, laundry room, pantry, powder room, mechanical room*, low voltage closet, common coat closet 1, common coat closet 2)

​

    - Doors

    - Trim

    - Interior walls

    - Exterior walls

    - Ceiling

    - Wooden cabinets

​

    Paint Materials

   

    - Painting tape

    - 5 gallon paint

    - 1 gallon moldicide primer

    - Pans

​

​

     Labor Estimate: $1,960.00 (ceiling)

     Labor Estimate: $5,865.00 (walls, trim, doors)

​

     Material Estimate: TBD

     

     Project Term: 2-3 days (ceiling)

     Project Term: 5-7days (walls, trim, doors)

​

​

​

​

Proposed Budget for Labor: $7,825.00

Proposed Budget for Parts/Materials: TBD

Proposed Budget for Fixtures: TBD

​

Total Proposed Budget: TBD

​

​

Hardwood Floor Refinishing

Hardwood Floor Refinishing - Zoe

 Proposed Scope:

​

 Flooring

​

(Main bedroom, main bedroom closet 1, main bedroom closet 2, living room, kitchen, dining, bedroom 2, bedroom 2 closet, bedroom 3, bedroom 3 closet, U-corridor, laundry room, pantry, low voltage closet, common coat closet 1, common coat closet 2)

​

   - Sand

   - Stain

   - Varnish

   

​

​

     Labor Estimate: $3,600.00

     Material Estimate: Stain and varnish included

     Project Term: 1 day

​

​

​

​

​

Proposed Budget for Labor: $3,600.00

Proposed Budget for Stain/Varnish: Included

​

Total Proposed Budget: $3,600.00

​

​

Drywall

Drywall - Zoe

 Proposed Scope:

​

(kitchen, U-corridor, low voltage closet)

​

   - Scrape, mud, sand kitchen bubble.

   - Patch, mud, sand two ceiling holes.

   

 Materials

   

    - 1 sheet of drywall

    - compound

    - drywall tape

    - fasteners

    - sanding blocks

​

​

     Labor Estimate: $350

     Material Estimate: TBD

     Project Term: 1 day

​

​

​

​

​

Proposed Budget for Labor: $350.00

Proposed Budget for Materials: TBD

​

Total Proposed Budget: $350.00

​

​

Structural Alterations

Structural - Zoe

 Proposed Scope:

​

(Dining and living room)

 

   Prep Work

 

    - Plastic tarp

    - Floor protection

    - Identify utility shutoffs

​

   Demolition

 

    - Remove drywall

    - Cut back electrical conduits to remove or reroute openings.

    - Remove framing

    - Remove fireplace.

​

    Electrical

 

    - Remove two receptacles on dining side.

    - Remove junction box on dining side.

    - Remove receptacle on living room side.

    - Remove junction box on living side.

    - Remove fireplace ignitor switch.

   

​

   Drywall

 

    - Patch/finish existing header.

​

​

     Labor Estimate: $2,900.00

     Material Estimate: TBD

     Project Term: 2-3 days

​

​

​

​

​

Proposed Budget for Labor: $2,900.00

Proposed Budget for Parts/Materials: TBD

Proposed Budget for Fixtures: TBD

​

Total Proposed Budget: TBD

​

​