Projects

Kostner

Kostner

Start Date: 9/1/2023 - 9/20/2023

PLUMBING 
     Private inspection
HVAC
    Deconstruct all existing exterior and interior framing, support columns, concrete slab. Haul away.

 

DRYWALL
    Remove all debris from demolition, broom sweep.

21st Street

Start Date: TBD

2.0 Carpentry


    Frame new exterior and interior walls.


2.1 Above Ground Plumbing
   
    In
stall water and drainage for new toilet, new shower, new bathroom sink and kitchenette sink. 
 

2.2 Drainage    

    Install new drain tile system.
    

    

2.3 Joists Replacement
    
Repair undersized joists as needed.


2.4 HVAC- Permit Required    

    

    Install 2.0 ton 95K BTU HVAC system.

 

2.0 Carpentry


    Frame new exterior and interior walls.


2.1 Above Ground Plumbing
   
    In
stall water and drainage for new toilet, new shower, new bathroom sink and kitchenette sink. 

 

2.2 Drainage    

    Install new drain tile system.
    

    

2.3 Joists Replacement
    
Repair undersized joists as needed.


2.4 HVAC- Permit Required    

    

    Install 2.0 ton 95K BTU HVAC system.

 

Washington

Start Date: TBD

Meet My Team

We're responsible for building a better future for you.

Facetune_08-08-2023-13-49-15_edited.jpg
Screen Shot 2023-07-29 at 1.02.36 PM.png

Ramon V.

Tynisha V.

Project Manager & Electrician

Project Manager

Screen Shot 2023-08-07 at 3.16.49 PM.png

Thoman M.

Architect

Construction Manager

Jose M.

Masonry Manager

Image by Jurica Koletić

Eric R.

Plumbing Manager

Project Notifications

Project Notifications

We've got something to tell you.

Blueprints are required for Phase 1 of your project.

Begin the process with us.

Already have blueprints? Upload  below.

Select File

Having trouble uploading? You can email your blueprints to us at: mail@vdevgroupllc.com

We're ready to secure the necessary permits for Phase 1 of your project.

View the invoice

3D scan required after basement area has been cleared and free of debris.

* For construction plans including design, floor plans, and structural engineering -- $15k

3D Scan

This portion of your project has not yet begun. We'll leave a few reference scans so you know what to expect.

​

Basement Level

Images

Example

Main Level

Example

Second Level

3.0 Electrical (Permit Required)
     Secure the proper paperwork to begin Phase 1 of your project.

3.1 Insula
tion
    Deconstruct all existing exterior and interi
or framing, support columns, concrete slab. Haul away.


 

3.2 Drywall  

    Set and square the frame. Fill and level the ground. Lay rebar. Pour the concrete. Level and round off the slab. Finish the surface. Allow concrete to cure and remove forms.

3.3
Paint

    Paint all walls.

4.0 Cabinet Installation
     Hang and secure all cabinets.

4.1 Countertop Installation
    Install all kitchen cabinets.

3.2 Tile  

    Set and square tiles, mortar and cleanup.

3.3
Finishing Carpentry

    Paint all walls.

PHASE 4

Start Date: TBD

PHASE 3

Start Date: TBD

Example

commrcial moving

Commercial Moving

Clearing your area before the real work begins.

*Service includes full moving and broom sweep of entire area.

Construction Manager

Thanks for ordering!

Contact Us

Screen Shot 2021-10-27 at 5.14_edited.pn

Project Manager:
Ramon Vargas

Business Hours:

Mon-Fri 7:00am-5:00pm

Phone:
773-415-7428

Have a question about your project? Connect with your project manager.

Contact
bottom of page